CST Level 1 Land Surveyor Certification Practice

Disable ads (and more) with a membership for a one time $2.99 payment

Prepare for the CST Level 1 Land Surveyor Certification. Study using flashcards and multiple-choice questions with detailed hints and explanations. Ace your exam!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


City surveying typically includes which of the following?

  1. Analysis of forestry areas

  2. Determination of the depths of lakes

  3. Layout of water and sewer systems

  4. Measurement of geological formations

The correct answer is: Layout of water and sewer systems

City surveying primarily focuses on the practical aspects of urban planning and infrastructure development. One of the critical functions within this field is the layout of water and sewer systems. This task involves precise measurements and planning to ensure that these essential services can adequately support the population, adhere to regulations, and integrate seamlessly with other city structures. Understanding the city’s topography, existing infrastructure, and the needs of residents is essential to this process. Proper layout ensures efficient service delivery, addressing issues such as drainage, availability of clean water, and waste management. This role is vital for maintaining public health and improving the quality of life in urban areas. In contrast, other choices relate to areas outside the primary focus of city surveying. For example, analysis of forestry areas is more aligned with environmental studies or land management than urban infrastructure. Determination of the depths of lakes pertains to hydrology rather than city planning, and measurement of geological formations falls within geological surveying, which is separate from the urban layout and development focus of city surveying.