What does a slope stake provide?

  1. Grade and elevation

  2. Location where cut or fill ends

  3. Lists the invert elevation

  4. Lists the PC station

The correct answer is: Location where cut or fill ends

A slope stake primarily provides the location where cut or fill ends on a construction project. This stake is crucial during grading processes, as it helps determine the transition point between areas of excavation (cut) and areas where material is being added (fill). By marking these endpoints, slope stakes assist surveyors and construction crews in understanding how to properly shape the land to meet design specifications. While stakes may also be used in conjunction with elevations and grades, their primary function in this context is to indicate the boundaries of where adjustments to the ground level will occur. Thus, understanding the role of a slope stake in the context of grading ensures that projects maintain appropriate design levels and slopes, facilitating safe and effective construction practices.